Skip to main content
Help Article
4 min read
Reviewed 2026-10-29

Keep equipment inspections up to date

List the assets that need scheduled inspection or certification, log each inspection and maintenance task, and see which assets are overdue or due soon.

Org Admin

Summary

  • Open Equipment in the sidebar (/dashboard/equipment). The page is titled Equipment & inspections.
  • The equipment register is for organisation admins only. Managers, staff and auditors cannot open it.
  • Each asset shows a compliance status: Pass, Fail, Overdue (next inspection date has passed), Due soon (due within 14 days) or No schedule.
  • An asset needs both an Inspection interval (days) and a Next inspection date to be on a schedule. Without them it shows No schedule and can never be flagged as overdue.

Steps

  1. 1. Add an asset

    Select Add asset. Enter Name and Category (for example VEHICLE, IT or PPE), choose a Status (ACTIVE, MAINTENANCE, INACTIVE or RETIRED), and optionally Location and Description. Set Inspection interval (days) and Next inspection to put it on a schedule.

  2. 2. Log a completed inspection

    Select Log inspection on the asset's row. Enter the Date performed (it cannot be in the future), choose a Result (Pass, Fail or Notes only), add notes and confirm. Logging an inspection sets the next due date to the date performed plus the asset's inspection interval, and recalculates its status.

  3. 3. Manage the asset in detail

    Select Open. The detail page has Details (owner, inspection interval, description; select Save details), Inspections, Maintenance (Preventive, Corrective, Calibration, Repair or Other, with who performed it and the cost in pounds) and Policies, where you link the operating or safety policies that govern the asset.

  4. 4. Work through what is overdue

    Use the All, Overdue and Due soon filters, or Review overdue on the red banner, to see which assets need attention.

Verification

  • The Total assets, Overdue and Due soon tiles match the asset list.
  • After you log a passing inspection, the asset's next inspection date has moved on and its status is no longer Overdue.
  • A failed or overdue asset raises an action for your organisation, which clears once a fresh inspection brings it back into date.

Troubleshooting

The page says I do not have access to it.

Only organisation admins can use the equipment register. It is also hidden until onboarding is finished and while the organisation is on the Guided Preview.

An asset always shows No schedule.

Set both an Inspection interval (days) and a Next inspection date, from Add asset or the asset's Details tab.

Logging an inspection was refused.

An inspection cannot be logged with a future date. Record it once it has been done.

An asset still shows Fail after it was fixed.

Status follows the latest inspection. Log a follow-up inspection with a Pass result.

Was this article helpful?

Next article

Register the AI systems you build or use

Keep an inventory of every AI system your organisation builds, deploys or relies on, with its EU AI Act risk class, lifecycle stage, owner and assessment dates.

Continue to next guide

Related articles

Evidence management and attachment best practices

Upload files that prove your policies and controls work, attach them to the right policy, control or incident, and keep them current.

5 min read

Use the dashboard to go from onboarding to rollout

The dashboard home takes you through each step in order: finish onboarding, publish your core policies, unlock team rollout, invite staff, assign training and run your first gap analysis.

4 min read

Register the AI systems you build or use

Keep an inventory of every AI system your organisation builds, deploys or relies on, with its EU AI Act risk class, lifecycle stage, owner and assessment dates.

4 min read

Need direct support?

If this workflow remains blocked after troubleshooting, submit a support request with the page URL, expected behaviour, and relevant error details.